Aurora Pool & Spa Isolation

In 2015 Engineering Dynamics Provided Pool and spa isolation for the Aurora Project ( Currently the tallest building in Melbourne at 92 Storeys). The scope included a 25m x 5m indoor pool, a 20 metre outdoor pool and two large circular spas at level 9 of the structure.

Our scope included the design supply and installation of:

PRODUCTS USED

  • Engineering Dynamics LR-9 Pool Isolators and Multilayer Pads
  • Engineering Dynamics Foam Void Former 30
  • Hydro-seals for all cold joints in pool / spa shell construction
  • Large Circular Void Formers in Spas to reduce weight of structure by 35%

OTHER SERVICES

  • Reinforcing inspections
  • Waterproof membrane inspection